New announcement. Learn more

Hall St renovation

Hall St, Cambridge

RENOVATION

Commenced 2020 


Modernising and reconfiguring a 1970's Masonry Block home. 

The Cambridge Alteration Project commenced in July 2020, with a complete re-roof in Corrugate Colorsteel. Gutting the entire interior linings, then made way for reconfiguring the spatial layout. This included an enlarged kitchen, Master Suite with walk-in robe and ensuite, and a second ensuite for the upstairs bedroom. New aluminium double glazed joinery started to replace the existing windows and doors. 

The project is ongoing, with new insulation, wall and ceiling linings, and fixtures still to be installed. 
Watch this space for photographs of the completed family home.

Get in touch today

ARCHITECTURAL DESIGN FOR NEW BUILD AND RENOVATIONS